RESPONSIBILITIES
(a)Prepare raw materials andensure proper material drying conditions.
(b)Verifycorrect material is used as per Mold Test Form and physically check thematerial bag descriptions with Mold Test Form before loads the material intothe hopper
(c)Install and dismantle injectionmolds safely and correctly
(d)Connect: Water lines, Hydrauliclines, Hot runner systems, Air lines, Temperature controllers
(e)Prepare moulding machines andauxiliary equipment for Mold trials